1: ECOSYSTEM AND FUNDAMENTALS OF REAL ESTATE DEVELOPMENT
Objective: Understand the value chain, the profitability model, and land sourcing strategies.
21
1.1
Module 1.1: The Developer’s role: Project Owner (Client), risk-taking, and value creation.
1.2
Module 1.2: Stakeholder mapping: Design Team, Project Managers, Engineers, Health & Safety Coordinators, Building Control, Authorities, and Banks.
1.3
Module 1.3: Profitability model: Gross margin, Internal Rate of Return (IRR), Return on Equity (ROE).
1.4
Expected Deliverable: Systemic mapping of project stakeholders defining the flows of interaction.
1.5
Module 2.1: Real estate cycles: Demographic factors, interest rates, and inflation.
1.6
Module 2.2: Asset typology: Residential (free-market, social, managed), Commercial, Logistics, Co-living.
1.7
Module 2.3: Housing policy analysis: State subsidies, tax incentives, and affordable housing.
1.8
Expected Deliverable: Briefing note on the impact of a central bank rate hike on purchasing power.
1.9
Module 3.1: Development strategies: Off-market prospecting vs. public land tenders.
1.10
Module 3.2: Digital tools: Geographic Information Systems (GIS), public land value databases.
1.11
Module 3.3: Landowner approach: Psychology of negotiation, identifying underutilized plots.
1.12
Expected Deliverable: Creation of a land targeting matrix for a specific municipality.
1.13
Module 4.1: Preliminary contracts: Unilateral Call Option vs. Bilateral Sales Agreement.
1.14
Module 4.2: Conditions precedent: Obtaining the Building Permit, clearing third-party appeals, soil pollution, financing.
1.15
Module 4.3: Price structuring: Fixed price, payment in kind (land-for-flats), price adjustment based on constructible area.
1.16
Expected Deliverable: Drafting the conditions precedent clauses for a complex Unilateral Call Option.
1.17
Module 5.1: Public consultation: Town hall meetings, NIMBYism vs. BIMBY (Build in My Back Yard).
1.18
Module 5.2: Developer’s charter: Local commitments, municipal environmental charters.
1.19
Module 5.3: Transparency and compliance: Anti-money laundering (AML), business ethics.
1.20
Expected Deliverable: Citizen consultation plan for an urban densification project.
1.21
QCM- 1
0 Questions
2: REGULATORY AND OPERATIONAL URBAN PLANNING
Objective: Master urban planning constraints and the administrative authorization process.
21
2.1
Module 6.1: Hierarchy of norms: Regional plans, Master Plans, Local Urban Plans (Zoning Bylaws).
2.2
Module 6.2: Deciphering the Zoning Plan: Written regulations, zoning maps, specific development guidelines.
2.3
Module 6.3: Public Utility Easements: Historical monuments, flood risk prevention plans, road alignments.
2.4
Expected Deliverable: Comprehensive regulatory audit based on an extract of a Local Urban Plan.
2.5
Module 7.1: Envelopes and densities: Site coverage, maximum height, setbacks, Gross Floor Area (GFA) calculation.
2.6
Module 7.2: Open spaces and parking: Deep-soil green spaces, parking ratios.
2.7
Module 7.3: Derogations and bonuses: Density bonuses for social mix or high energy performance.
2.8
Expected Deliverable: Detailed calculation of the theoretical maximum GFA on a highly constrained plot.
2.9
Module 8.1: The Building Permit (BP): Required architectural drawings, technical notices, standard forms.
2.10
Module 8.2: Application processing: Statutory timeframes, consultation of specific commissions (accessibility, fire safety).
2.11
Module 8.3: Subdivision Permits: Land division, creation of roads, and shared utilities.
2.12
Expected Deliverable: Compliance checklist for a comprehensive Building Permit application package.
2.13
Module 9.1: On-site posting: Mandatory information, bailiff’s affidavit (3 visits).
2.14
Module 9.2: Urban planning litigation: Administrative appeals, judicial appeals, legal standing to sue.
2.15
Module 9.3: Injunctions and withdrawal periods: Administration’s withdrawal rights, settlement agreements with neighbors.
2.16
Expected Deliverable: Chronological strategy chart (Gantt) for clearing a Building Permit of all appeal risks.
2.17
Module 10.1: Joint Development Zones (ZAC): Development concessions, land transfer specifications.
2.18
Module 10.2: Public-Private Partnerships: Financing of public infrastructure by developers.
2.19
Module 10.3: Urban planning taxation: Development Tax, Preventive Archeology Tax.
2.20
Expected Deliverable: Forecast calculation of the Development Tax for a 5,000 sqm mixed-use project.
2.21
QCM- 2
0 Questions
3: MARKET RESEARCH AND PROGRAMMING
Objective: Define the ideal real estate product in line with demand and competition.
21
3.1
Module 11.1: Primary supply analysis: Identifying competing developments currently on the market.
3.2
Module 11.2: Price tracking: Pricing grids ($/sqm or €/sqm), absorption rates, hard stock.
3.3
Module 11.3: Feature analysis: Range level, green certifications, annexes (balconies, parking).
3.4
Expected Deliverable: Competitive benchmarking matrix (SWOT) for a defined catchment area.
3.5
Module 12.1: Socio-demographic indicators: Household evolution, socio-professional categories, net migration.
3.6
Module 12.2: Residential journey: First-time buyers, second-time buyers, buy-to-let investors.
3.7
Module 12.3: New trends: Remote work (home offices), outdoor spaces, soft mobility.
3.8
Expected Deliverable: “Buyer Persona” profile detailing the commercial targets of the project.
3.9
Module 13.1: Typological mix: Distribution of Studios, 1-bed, 2-bed, 3-bed, 4-bed+ units based on local housing policies.
3.10
Module 13.2: Usable and net internal areas: Average sizing per typology (reference grid).
3.11
Module 13.3: Shared spaces: High-capacity bike rooms, rooftops, community gardens.
3.12
Expected Deliverable: Detailed programming grid (Number of units, areas, annexes).
3.13
Module 14.1: Office buildings: Flex office, coworking, capacity ratios (1 workstation/10 sqm).
3.14
Module 14.2: Ground-floor retail: Technical constraints (exhaust shafts, clear heights, utilities).
3.15
Module 14.3: Public Access Buildings: Accessibility constraints (ADA compliance) and fire safety.
3.16
Expected Deliverable: Technical programming memo for integrating a food retail store on the ground floor.
3.17
Module 15.1: Forecasted Gross Development Value (GDV): Weighted areas, average sales price.
3.18
Module 15.2: Cost ratios: Hard construction costs ($/sqm GFA), soft costs (fees), financial costs.
3.19
Module 15.3: Residual Land Value calculation: Deducting costs and developer profit to find the maximum affordable land price.
3.20
Expected Deliverable: Excel modeling of a static Residual Land Value appraisal.
3.21
QCM- 3
0 Questions
4: TECHNICAL AND ARCHITECTURAL FEASIBILITY
Objective: Validate the site's construction capacities and launch the architectural schematic design.
21
4.1
Module 16.1: Topographic survey and boundary marking: Role of the land surveyor, altimetry, party walls.
4.2
Module 16.2: Geotechnical study: Feasibility and design phases, bearing capacity, water table level.
4.3
Module 16.3: Pollution and asbestos studies: Phase 1 & 2 Environmental Site Assessments, soil management plans.
4.4
Expected Deliverable: Analysis report of a geotechnical study with recommendations on foundations.
4.5
Module 17.1: Urban integration: Architectural vision, facades, massing.
4.6
Module 17.2: Plan efficiency: Structural grid, utility shafts, Net-to-Gross ratio (spatial profitability).
4.7
Module 17.3: User experience quality: Dual-aspect units, compactness, privacy management.
4.8
Expected Deliverable: Critical audit of a schematic floor plan (optimizing circulation spaces).
4.9
Module 18.1: Utility providers: Electricity, gas, telecoms, potable water networks.
4.10
Module 18.2: Sanitation: Wastewater management, stormwater retention sizing.
4.11
Module 18.3: District heating networks: Mandatory urban connections, geothermal energy._è
4.12
Expected Deliverable: Master plan for utility connections and site servicing.
4.13
Module 19.1: Conservation areas: Role of Heritage Architects and historical preservation boards.
4.14
Module 19.2: Flora/Fauna studies: Water laws, protected species, ecological compensation.
4.15
Module 19.3: Preventive archeology: State diagnostics and archaeological excavations.
4.16
Expected Deliverable: Development of a project timeline integrating an archaeological diagnostic phase.
4.17
Module 20.1: Risk matrix: Mapping of legal, technical, and commercial risks.
4.18
Module 20.2: Sunk costs budget: Provisions for architectural and engineering fees prior to the permit.
4.19
Module 20.3: Pitching the project: Executive summary, investment rationale.
4.20
Expected Deliverable: Complete drafting of an Investment Committee Memo (Strategic presentation note).
4.21
QCM- 4
0 Questions
5: LEGAL STRUCTURING AND SETUP
Objective: Master corporate structuring, design contracts, and partnership security.
21
5.1
Module 21.1: The Real Estate Development Company (e.g., SCCV/LLC): Corporate purpose, tax transparency, liability.
5.2
Module 21.2: Joint-Stock Companies for development: Statutory flexibility, corporate tax, cash/in-kind equity contributions.
5.3
Module 21.3: Shareholders’ agreements: Voting rights, exit clauses (bad leaver/good leaver), dividend distribution.
5.4
Expected Deliverable: Drafting the basic articles of incorporation for an SPV and defining its corporate purpose.
5.5
Module 22.1: Dismemberment of property: Bare ownership vs. Usufruct, social affordable leasing.
5.6
Module 22.2: Ground leases and Emphyteutic leases: Real rights, lease fees, duration.
5.7
Module 22.3: Payment in kind (Dation): Full or partial payment in built units, securing the landowner.
5.8
Expected Deliverable: Legal structuring diagram for a Community Land Trust or Ground Lease operation.
5.9
Module 23.1: The Architect’s contract: Scope of work (Schematic to Final Completion), copyrights, limits of service.
5.10
Module 23.2: Engineering contracts: Structural, MEP (Mechanical, Electrical, Plumbing), acoustic, thermal.
5.11
Module 23.3: Liability and sensitive clauses: Penalties for design delays, standard public procurement laws vs. private.
5.12
Expected Deliverable: Critical analysis of a design team contract (identifying abusive clauses).
5.13
Module 24.1: Protected sector (Housing) vs. Free sector: Public policy, Completion guarantees.
5.14
Module 24.2: Staggered payments schedule: e.g., 35% (foundations), 70% (watertight), 95% (practical completion).
5.15
Module 24.3: The Technical Specifications Document: Contractual binding document, material equivalents.
5.16
Expected Deliverable: Structuring a summary technical specifications document compliant with housing laws.
5.17
Module 25.1: Joint Ventures (JV): Holding company structuring, management agreements.
5.18
Module 25.2: Division of roles: Role of the managing partner vs. technical partner, delegation of authority.
5.19
Module 25.3: Dispute resolution: Mediation, arbitration, cross-purchase of shares (Texas shootout).
5.20
Expected Deliverable: Template for a co-development joint venture agreement between two developers.
5.21
QCM- 5
0 Questions
6: FINANCIAL ENGINEERING AND DEVELOPMENT APPRAISAL
Objective: Accurately model the project's budget, cash flows, and financial profitability.
21
6.1
Module 26.1: Cost lines: Land, hard construction, soft costs (fees), taxes, marketing, and financing costs.
6.2
Module 26.2: Revenue lines: Gross Sales Value, Net Sales Value, subsidies, service charge recoveries.
6.3
Module 26.3: Margin analysis: Gross margin, net margin, Earnings Before Tax (EBT), margin on cost vs. margin on GDV.
6.4
Expected Deliverable: Structuring a detailed developer’s financial appraisal on Excel.
6.5
Module 27.1: Construction ratios: Estimation per sqm GFA, core & shell vs. fit-out ratios, special foundations.
6.6
Module 27.2: Technical and legal fees: Standard ratios (e.g., Design Team 6-8%, Building Control 1%).
6.7
Module 27.3: Contingencies and provisions: Allowances for land, technical, and commercial risks.
6.8
Expected Deliverable: Estimating the construction budget of a project using the cross-ratio method.
6.9
Module 28.1: Inflow dynamics: Sales velocity (pre-sales, tail-end sales) and staged payment calls.
6.10
Module 28.2: S-Curve of expenses: Design fee disbursements, construction drawdowns, recoverable VAT.
6.11
Module 28.3: Working Capital Requirement (WCR): Peak equity exposure, critical cash month.
6.12
Expected Deliverable: Development of a monthly cash-flow plan and identification of the peak equity requirement.
6.13
Module 29.1: Internal Rate of Return (IRR): Project IRR vs. Equity IRR (leverage effect).
6.14
Module 29.2: Return on Equity (ROE) and Equity Multiple (MOIC): Return on invested capital.
6.15
Module 29.3: Sensitivity testing: Impact of a cost increase (+5%), price drop (-3%), or a 6-month delay.
6.16
Expected Deliverable: Creation of a two-way data table (Costs / Revenues) showing impacts on the net margin.
6.17
Module 30.1: Phasing engineering: Splitting the project into functional phases to smooth out cash flows.
6.18
Module 30.2: Land payment optimization: Deferred payments, forward purchase.
6.19
Module 30.3: Interest rate risk management: SWAPs, hedging, impact on financial costs.
6.20
Expected Deliverable: Action plan to restore the margin of an underperforming development budget.
6.21
QCM- 6
0 Questions
7: FINANCING AND FUNDRAISING
Objective: Master debt instruments, equity sourcing, and completion risk coverage.
21
7.1
Module 31.1: Credit mechanisms: Land acquisition facility, construction facility, VAT facility.
7.2
Module 31.2: Conditions precedent to drawdown: Pre-sales hurdle (40 to 50% of GDV), margin ratio, track record.
7.3
Module 31.3: Cost of debt: Interest rate (Base rate + margin), commitment fees, structuring fees.
7.4
Expected Deliverable: Compilation of a bank financing request memorandum.
7.5
Module 32.1: Developer’s equity: Minimum skin in the game (10 to 20% of total development cost).
7.6
Module 32.2: Real estate crowdfunding: Bond issuance, yield rates, pros/cons.
7.7
Module 32.3: Private Equity Funds and Club Deals: Capitalist partnerships, mezzanine financing.
7.8
Expected Deliverable: Pitch deck aimed at a real estate crowdfunding platform.
7.9
Module 33.1: Legal foundations: Mandatory requirement for off-plan residential sales, protecting the buyer.
7.10
Module 33.2: Extrinsic guarantees: Bank surety, pricing (risk premium).
7.11
Module 33.3: Triggering conditions: Developer default, substitution by a delegated project manager.
7.12
Expected Deliverable: Analysis of the suspension and default clauses in a Completion Guarantee agreement.
7.13
Module 34.1: Real security interests: First-ranking mortgage, lender’s lien.
7.14
Module 34.2: Personal guarantees: Joint and several guarantees, First Demand Guarantees.
7.15
Module 34.3: Pledges: Pledge over receivables (centralized bank accounts), pledge over company shares.
7.16
Expected Deliverable: Cross-matrix of acceptable collateral by type of financing.
7.17
Module 35.1: The Term Sheet: Reading and negotiating Conditions Precedent (CPs).
7.18
Module 35.2: Drawdowns and certifications: Validations by the building inspector, architect’s certificates.
7.19
Module 35.3: Covenants and reporting: Maintenance of margin ratios, centralized cash flows, quarterly audits.
7.20
Expected Deliverable: Drafting a project status report (quarterly bank reporting).
7.21
QCM- 7
0 Questions
8: REAL ESTATE TAXATION
Objective: Secure and optimize the tax burden (VAT, Registration Duties, Corporate Tax).
21
8.1
Module 36.1: Scope of application: New builds, standard rates vs. reduced rates (affordable zones).
8.2
Module 36.2: VAT on margin regime: Purchasing without the right to deduct, calculating the tax base.
8.3
Module 36.3: Self-Supply Delivery: Mechanism and reporting obligations for build-to-rent.
8.4
Expected Deliverable: Practical exercise: Choosing between VAT on total price vs. VAT on margin with modeling.
8.5
Module 37.1: Commitment to build: Reduced fixed duties, 4-year statutory deadline.
8.6
Module 37.2: Commitment to resell: Property flipper/trader regime (reduced proportional duties).
8.7
Module 37.3: Extensions and penalties: Recalculation, late payment penalties, and standard duties applied retroactively.
8.8
Expected Deliverable: Formal request letter for extending the commitment to build to the tax authorities.
8.9
Module 38.1: Taxation of the SPV: Tax transparency, taxation at the shareholder level (Income or Corporate Tax).
8.10
Module 38.2: Revenue recognition: Percentage of completion method vs. completed contract method.
8.11
Module 38.3: Distributions: Dividend regimes, intra-group taxation (parent-subsidiary regime).
8.12
Expected Deliverable: Modeling the upstream flow of net-of-tax cash to the parent holding company.
8.13
Module 39.1: Property Tax: Temporary exemptions for new builds, declaration forms.
8.14
Module 39.2: Commercial Office Tax: Specific regional taxes, tariff zones.
8.15
Module 39.3: Public Sewerage Connection Tax.
8.16
Expected Deliverable: Calendar of post-completion tax declarations.
8.17
Module 40.1: Residential Tax Incentives (e.g., Pinel/Section 42 equivalents): Income caps, rent caps, quality criteria.
8.18
Module 40.2: Furnished Rentals / Managed Residences: Student housing, senior living, depreciation, VAT recovery.
8.19
Module 40.3: Land Deficits and Heritage properties: Rehabilitation tax credits.
8.20
Expected Deliverable: Complete tax simulation for a retail investor buying an incentive-backed unit.
8.21
QCM- 8
0 Questions
9: DESIGN MANAGEMENT (CONCEPT / SCHEMATIC / DETAILED)
Objective: Lead the design team, validate technical choices, and optimize constructibility (BIM).
21
9.1
Module 41.1: Architectural review: Validating massing, structural grids, facades.
9.2
Module 41.2: Area assessment: GFA, Net Internal Area, checking the efficiency ratio.
9.3
Module 41.3: Preliminary financial estimate: Controlling against the initial feasibility budget.
9.4
Expected Deliverable: Validation of a Schematic Design package (Project review minutes).
9.5
Module 42.1: Freezing floor plans: Marketing floor plans for sales, validation of structural modifications.
9.6
Module 42.2: Material specification: Detailed technical specs, choosing HVAC (Heating, Ventilation, Air Conditioning) systems.
9.7
Module 42.3: Pre-sizing: Concrete structural plans, MEP routing, initial thermal calculations.
9.8
Expected Deliverable: Development of a technical specification validation sheet (tiling, windows, HVAC).
9.9
Module 43.1: Project design studies: Detailed technical specifications per trade.
9.10
Module 43.2: Coordination and synthesis: Inter-trade synthesis plans, spatial clash detection.
9.11
Module 43.3: Architect’s approval: Validating contractors’ shop drawings (Execution plans).
9.12
Expected Deliverable: Analysis report on MEP/Structural clashes identified during the synthesis phase.
9.13
Module 44.1: BIM Execution Plan (BEP): Role of the BIM Manager, Level of Development/Information (LOD/LOI).
9.14
Module 44.2: Deployment: Architectural, structural, and MEP models in IFC format.
9.15
Module 44.3: Developer Use Cases: Quantity takeoff, clash detection, VR for marketing.
9.16
Expected Deliverable: Drafting the Employer’s Information Requirements (EIR) for a BIM protocol.
9.17
Module 45.1: Value analysis: Rationalizing foundations, industrialization, prefabrication.
9.18
Module 45.2: Technical alternatives: Timber vs. Concrete frame, types of floor slabs.
9.19
Module 45.3: Quality/Cost trade-offs: Facade materials, standardization of bathroom pods.
9.20
Expected Deliverable: “Value Engineering” decision matrix with cost-saving quantifications.
9.21
QCM- 9
0 Questions
10: ENVIRONMENTAL ENGINEERING AND CERTIFICATIONS
Objective: Design decarbonized, resilient buildings compliant with green standards and taxonomies.
21
10.1
Module 46.1: Energy indicators: Bioclimatic needs, Primary Energy consumption.
10.2
Module 46.2: Carbon indicators: Energy Carbon, Construction Carbon (Dynamic Life Cycle Assessment – LCA).
10.3
Module 46.3: Summer comfort: Degree-Hours indicator, passive cooling solutions (sunshades, cross-ventilation).
10.4
Expected Deliverable: Optimization note to reduce the heating/cooling load for a poorly oriented residential project.
10.5
Module 47.1: Bio-based and geo-based materials: Timber frame, Cross-Laminated Timber (CLT), hempcrete, rammed earth.
10.6
Module 47.2: Circular economy: On-site and off-site reuse, material audits, selective deconstruction.
10.7
Module 47.3: Low-carbon concrete: Clinker substitution (slag, fly ash), green cements.
10.8
Expected Deliverable: Simplified comparative carbon footprint: Traditional Concrete vs. Hybrid Timber/Concrete.
10.9
Module 48.1: Energy vectors: Individual/collective Heat Pumps, biomass, green gas.
10.10
Module 48.2: Self-consumption: Solar photovoltaics, solar thermal, energy storage.
10.11
Module 48.3: Water management: Rainwater harvesting tanks, greywater recycling, low-flow fixtures.
10.12
Expected Deliverable: Feasibility study for a rooftop photovoltaic system with collective self-consumption.
10.13
Module 49.1: Combating urban heat islands: Green facades and roofs, high-albedo materials.
10.14
Module 49.2: Permeability: De-sealing surfaces, bioswales, Biotope Area Factor (BAF).
10.15
Module 49.3: Biodiversity: Ecological niches, preserving deep soil, green/blue corridors.
10.16
Expected Deliverable: Stormwater management plan at the plot scale (zero discharge goal).
10.17
Module 50.1: Green Building Labels: BREEAM, LEED, HQE, Zero Carbon standards.
10.18
Module 50.2: Certification process: Green building consultants, design/construction audits, induced costs.
10.19
Module 50.3: EU Taxonomy: Alignment criteria for institutional investors (Green Funds).
10.20
Expected Deliverable: Strategy outline to achieve “Excellent” rating in BREEAM for an office building.
10.21
QCM- 10
0 Questions
11: MARKETING, SALES, AND OFF-PLAN CONTRACTS
Objective: Drive the sales of real estate assets, from marketing strategies to the final deed.
21
11.1
Module 51.1: Project identity: Naming, storytelling, creation of the commercial brochure.
11.2
Module 51.2: 3D and immersive tools: Exterior renderings, virtual tours, interactive scale models.
11.3
Module 51.3: Media plan: Web acquisition campaigns (Google/Social Ads), real estate listing portals.
11.4
Expected Deliverable: Comprehensive brief for creating the visual identity of a premium development.
11.5
Module 52.1: In-house sales: Sales representatives, sales pavilion setup, decorated model units.
11.6
Module 52.2: External broker networks: Wealth management advisors, independent brokers, commission structures.
11.7
Module 52.3: Bulk sales (Institutional): Social housing providers, institutional landlords, corporate funds.
11.8
Expected Deliverable: Commission and mandate grid for an external brokerage network.
11.9
Module 53.1: Legal framework: Mandatory clauses, statutory cooling-off periods (e.g., 10 days).
11.10
Module 53.2: Security deposit: Legal percentages, funds held in escrow by the Notary.
11.11
Module 53.3: Buyer’s condition precedent: Obtaining a mortgage, validity periods.
11.12
Expected Deliverable: Legal audit of a preliminary reservation contract (identifying loopholes).
11.13
Module 54.1: Preparation of the Notary file: Condominium division state, Homeowners Association (HOA) rules.
11.14
Module 54.2: The signing process: One-month advance notice, Developer’s Notary vs. Buyer’s Notary.
11.15
Module 54.3: Stage payment calls: Transmitting the architect’s progress certificates, reminders, late penalty fees.
11.16
Expected Deliverable: Simulation of a stage payment schedule for a buyer over a 24-month build.
11.17
Module 55.1: The options catalog: Choosing finishes (hardwood, tiles, smart home tech).
11.18
Module 55.2: Buyer requested modifications: Moving partition walls, adding electrical points, ADA constraints.
11.19
Module 55.3: Process and invoicing: Quotes, design team validation, buyer invoicing, and management margins.
11.20
Expected Deliverable: Creation of an internal Standard Operating Procedure (SOP) for managing buyer modifications.
11.21
QCM- 11
0 Questions
12: TENDERING AND CONSTRUCTION CONTRACTS
Objective: Organize the bidding process, analyze offers, negotiate, and draft contractor agreements.
21
12.1
Module 56.1: Procurement routes: General Contractor (GC) vs. Separate Trade Contractors (Trade lots) vs. Macro-lots.
12.2
Module 56.2: Pros and cons: Site coordination (CM), delay guarantees, cost premiums (GC margin).
12.3
Module 56.3: Sourcing contractors: Professional qualifications, financial health, capacity to deliver.
12.4
Expected Deliverable: Decision matrix “General Contractor vs. Separate Trades” applied to a specific project.
12.5
Module 57.1: Written documents: Special Administrative Conditions, Technical Specifications per lot, master schedule.
12.6
Module 57.2: Financial documents: Bill of Quantities (BoQ), Unit Price Schedule.
12.7
Module 57.3: Graphic documents: Final execution/tender drawings from the design team.
12.8
Expected Deliverable: Drafting the Special Administrative Conditions focusing on penalties and warranties.
12.9
Module 58.1: Tender process: Bidding rules, site visits, Q&A phase.
12.10
Module 58.2: Bid leveling: Technical analysis, alternatives, financial analysis (normalizing bids).
12.11
Module 58.3: The Tender Analysis Report: Scoring, recommendations from the lead architect/engineer.
12.12
Expected Deliverable: Construction of a bid leveling and financial comparison grid (multi-trade).
12.13
Module 59.1: Negotiation strategies: Target cost, multi-round negotiations, Best and Final Offer (BAFO).
12.14
Module 59.2: Contractor interviews: Evaluating site management staff, methodology.
12.15
Module 59.3: Finalizing the scope: Technical realignments, integrating accepted value engineering alternatives.
12.16
Expected Deliverable: Preparation of a negotiation script for a structural works package that is over budget.
12.17
Module 60.1: Private construction contracts: Contractual documents and their hierarchy.
12.18
Module 60.2: Notice to Proceed (NTP): Mobilization order, start of works order.
12.19
Module 60.3: Contractors’ financial guarantees: 5% retention money, performance bonds.
12.20
Expected Deliverable: Drafting a construction contract clause integrating subcontracting and vetting procedures.
12.21
QCM- 12
0 Questions
13: INSURANCE AND RISK MANAGEMENT
Objective: Set up mandatory insurance policies and manage the safety of the construction operation.
21
13.1
Module 61.1: Environmental risks: Uncovering pollution during earthworks, severe weather events.
13.2
Module 61.2: Technical risks: Contractor bankruptcy, construction defects, collapses.
13.3
Module 61.3: Financial/Legal risks: Budget overruns, project blocked by third-party injunctions.
13.4
Expected Deliverable: Project Risk Register with severity scoring and mitigation measures.
13.5
Module 62.1: Inherent Defects Insurance (Structural): Legal obligation, pre-financing of repairs.
13.6
Module 62.2: Builders Risk Insurance (Contractors’ All Risks): Accidental damage to the works before handover, theft, fire.
13.7
Module 62.3: Non-Builder Developer Liability: Covering the 10-year liability of the developer acting as a seller.
13.8
Expected Deliverable: Compilation of an underwriting file for Inherent Defects / Builders Risk insurance.
13.9
Module 63.1: 10-Year Civil Liability: Strict control of certificates, matching sectors of activity, coverage limits.
13.10
Module 63.2: Professional Indemnity (PI): Coverage for intangible damages and design errors.
13.11
Module 63.3: Policy monitoring: Validity at site opening and maintenance of coverage throughout construction.
13.12
Expected Deliverable: Validity audit of a contractor’s 10-year liability insurance certificate for a complex trade.
13.13
Module 64.1: The HSE Coordinator: Levels of intervention, design phase vs. execution phase duties.
13.14
Module 64.2: The General Coordination Plan: Prevention measures, site welfare facilities, hygiene, simultaneous operations.
13.15
Module 64.3: The Post-Construction Maintenance File: Securing future facility management operations.
13.16
Expected Deliverable: Analysis of a General Coordination Plan identifying risks linked to simultaneous operations on site.
13.17
Module 65.1: Mandatory missions: Structural integrity, Fire safety, Accessibility for disabled persons.
13.18
Module 65.2: Complementary missions: Thermal, Acoustics, Safety of adjacent existing structures.
13.19
Module 65.3: Initial Technical Control Report: Tracking suspended or unfavorable technical opinions.
13.20
Expected Deliverable: Action plan to clear an unfavorable opinion from the Building Inspector regarding an emergency staircase.
13.21
QCM- 13
0 Questions
14: SITE PREPARATION AND CONSTRUCTION LAUNCH
Objective: Set up the site layout, manage administrative steps, and launch the structural works.
21
14.1
Module 66.1: Site Layout Plan: Crane positioning, welfare facilities, storage zones, temporary roads.
14.2
Module 66.2: Temporary utilities: Water connections, heavy-duty electricity, telecom networks.
14.3
Module 66.3: Launching shop drawings: Validation process by the Building Inspector and the Architect.
14.4
Expected Deliverable: Critical review of a Site Layout Plan for a dense urban environment.
14.5
Module 67.1: Notice of Commencement of Works: Notification to the municipality, triggering insurance policies.
14.6
Module 67.2: Dilapidation reports and Pre-construction surveys: Bailiff reports of adjacent properties, court-appointed experts.
14.7
Module 67.3: Mandatory signage: Regulatory project billboard, safety signs, labor inspectorate info.
14.8
Expected Deliverable: Drafting a legal petition for a preventive expert survey for a project with fragile party walls.
14.9
Module 68.1: Project Director vs. Site Manager: Roles, managing workers, time management.
14.10
Module 68.2: Construction Management (Scheduling & Coordination): Key role in multi-trade setups, schedule management.
14.11
Module 68.3: Site meetings: Framework, mandatory attendees, decision-making loop, meeting minutes.
14.12
Expected Deliverable: Professional template for the Site Meeting Minutes #1.
14.13
Module 69.1: Subcontracting laws: Mandatory declarations, approval by the Project Owner.
14.14
Module 69.2: Payment guarantees: Direct payment delegations, bank guarantees from the main contractor.
14.15
Module 69.3: Duty of vigilance: Developer’s responsibility (social security certificates, worker ID cards, foreign labor).
14.16
Expected Deliverable: Strict SOP for vetting and approving a subcontractor (Legal checklist).
14.17
Module 70.1: Soil remediation and earthworks: Tracking waste manifests, soil evacuation.
14.18
Module 70.2: Special foundations: Piles, micro-piles, diaphragm walls (managing geological contingencies).
14.19
Module 70.3: Groundbreaking Ceremony: Real estate marketing, PR with local politicians, press coverage.
14.20
Expected Deliverable: Logistics plan for the evacuation of excavated soil in a constrained urban area.
14.21
QCM- 14
0 Questions
15: EXECUTION MANAGEMENT AND COORDINATION
Objective: Physically manage the site, control the schedule, and guarantee execution quality.
21
15.1
Module 71.1: Detailed schedules: Line-of-balance, Gantt charts, defining the critical path.
15.2
Module 71.2: Progress tracking: Periodic recalibration, identifying schedule slippage.
15.3
Module 71.3: Catch-up plans: Overtime/weekend work, forced simultaneous operations, injunctions.
15.4
Expected Deliverable: Updating a Gantt chart and proposing a recovery plan for a 3-week delay.
15.5
Module 72.1: Compliance control: Strict adherence to technical specs, rejecting non-compliant materials.
15.6
Module 72.2: Inspection sheets and Hold points: Rebar inspections, concrete pours, blower-door tests.
15.7
Module 72.3: Interface management: Handling the limits of work between trades (e.g., Structure vs. Waterproofing).
15.8
Expected Deliverable: Creation of a critical hold-point inspection grid for pouring transfer slabs.
15.9
Module 73.1: Low Nuisance Sites: Green site charters, waste management, 7-stream on-site sorting.
15.10
Module 73.2: Noise and neighbors: Authorized hours, dust suppression misting, neighborhood communication.
15.11
Module 73.3: Surprise inspections: Occupational Health & Safety boards, Labor Inspectorate, managing workplace accidents.
15.12
Expected Deliverable: Drafting a crisis communication plan in the event of a severe accident on site.
15.13
Module 74.1: Severe weather delays: Claiming weather days, compensation funds, justification via meteorological data.
15.14
Module 74.2: Theft and vandalism: Filing Builders Risk insurance claims, security guards, CCTV.
15.15
Module 74.3: Site abandonment: Formal notices, bailiff’s ascertainment, contract termination, replacement.
15.16
Expected Deliverable: Emergency procedure for terminating a contractor and awarding a substitute contract.
15.17
Module 75.1: Topping out ceremony: Completion of the structural frame and roofing.
15.18
Module 75.2: Building envelope: Exterior windows/doors, flat roof waterproofing, water tests.
15.19
Module 75.3: Launching the Fit-out (Second Fix): Partitioning, routing MEP (Mechanical, Electrical, Plumbing) within walls.
15.20
Expected Deliverable: Progress certificate triggering the “Watertight” stage payment call to buyers.
15.21
QCM- 15
0 Questions
16: FINANCIAL MANAGEMENT OF CONSTRUCTION
Objective: Secure contractor payments, control variation orders, and settle the site overheads account.
21
16.1
Module 76.1: Approval circuit: Contractor’s application for payment, Project Manager’s certification, Owner’s payment.
16.2
Module 76.2: Progress control: Verifying physical reality vs. contractor’s declared completion percentage.
16.3
Module 76.3: Mandatory payment terms: Legal deadlines, late payment interest, 5% retention money (or bank bond).
16.4
Expected Deliverable: Cross-validation of a monthly valuation (#5) applying the 5% retention money.
16.5
Module 77.1: Origins of VOs: Design errors, Owner requests, unforeseen ground conditions, regulatory changes.
16.6
Module 77.2: Approval and Amendments: Analyzing unit prices, joint-measurement sheets, signing contract addendums.
16.7
Module 77.3: Buyer Modifications on site: Transmitting to site, coordination markup, invoicing the buyer.
16.8
Expected Deliverable: Analysis and formal rejection of an unjustified Variation Order claim.
16.9
Module 78.1: Functioning: Managing shared expenses (cleaning, site electricity, fencing, welfare facilities).
16.10
Module 78.2: Role of the manager (Often the GC): Provisional budget, cash calls prorated to contract values.
16.11
Module 78.3: Reconciliation and closure: Supervisory committee, contractor clearance, settling at the end of the project.
16.12
Expected Deliverable: Audit and apportionment of a pro-rata account, including charging back cleanliness penalties.
16.13
Module 79.1: Contractual principles: Fixed prices vs. Escalation clauses, grace periods.
16.14
Module 79.2: Construction indices: National building indices, specific trade indices (e.g., steel, timber).
16.15
Module 79.3: Calculation mechanics: Escalation formula, fixed portion (e.g., 15%), calculating the adjustment coefficient.
16.16
Expected Deliverable: Calculating the price escalation on a monthly valuation using official building indices.
16.17
Module 80.1: Draft Final Account: Submitted by the contractor post-handover.
16.18
Module 80.2: Establishing the Final Account: Done by the Project Manager, integrating VOs, escalations, delay damages (Liquidated Damages).
16.19
Module 80.3: Disputes and claims memorandums: Deadlines to contest, handling financial litigation.
16.20
Expected Deliverable: Drafting a Final Statement of Account enforcing Liquidated Damages for delay.
16.21
QCM- 16
0 Questions
17: PRACTICAL COMPLETION, SNAGGING AND HANDOVER
Objective: Conduct preliminary inspections, declare practical completion, and deliver to buyers.
21
17.1
Module 81.1: Partition visits (First fix): Welcoming the buyer, checking electrical layouts, managing emotional marketing.
17.2
Module 81.2: Completion of Fit-out: Painting, flooring, tiling, testing MEP systems (ventilation, heating).
17.3
Module 81.3: Builders clean: Deep cleaning, window washing, clearing the site perimeters.
17.4
Expected Deliverable: Pre-delivery inspection checklist for the Developer (Standard apartment).
17.5
Module 82.1: The OPR process: Exhaustive walkthroughs by the design team, functional testing of the whole building.
17.6
Module 82.2: Snagging list: Categorization (aesthetic, technical, incomplete works, non-compliance).
17.7
Module 82.3: De-snagging schedule: Injunctions to contractors, daily tracking of snag clearances.
17.8
Expected Deliverable: Compilation of a pre-completion snagging list categorized by trade.
17.9
Module 83.1: Pronouncing Completion: Certificate of Practical Completion (Owner/Contractors), with or without snags, tacit or judicial.
17.10
Module 83.2: Legal effects: Start date for statutory warranties (1-year, 2-year, 10-year), transfer of care, custody, and control.
17.11
Module 83.3: Refusal of Completion: Legitimate grounds (uninhabitable, dangerous), impact on insurances.
17.12
Expected Deliverable: Drafting a Certificate of Practical Completion with clear notification of major snags.
17.13
Module 84.1: Organizing handovers: Summons (advance notice period), the D-Day sequence.
17.14
Module 84.2: Joint walkthrough and inventory: Reporting non-conformities, escrowing the final 5% payment by the buyer.
17.15
Module 84.3: Key handover and Welcome Pack: Explaining how to operate systems (heating, smart home, access control).
17.16
Expected Deliverable: Complete Client Handover Protocol: Speech, circuit, and handling a disgruntled client crisis.
17.17
Module 85.1: Declaration of Completion and Compliance: Filing to the municipality.
17.18
Module 85.2: Municipal inspection: Zoning authorities checking compliance with the Building Permit.
17.19
Module 85.3: As-Built Documentation (O&M Manuals): Handover from contractors, As-built drawings, technical manuals.
17.20
Expected Deliverable: Assembly framework for the O&M Manuals and the Compliance Declaration for final filing.
17.21
QCM- 17
0 Questions
18: AFTER-SALES, LEGAL WARRANTIES AND LITIGATION
Objective: Manage the building's life post-handover, legal warranties, and the Homeowners Association.
21
18.1
Module 86.1: Scope of the DLP: All snags noted at handover or arising during the first year.
18.2
Module 86.2: Developer’s After-Sales Service: Customer care unit, ticketing platform, interventions.
18.3
Module 86.3: Formal notice and substitution: Procedure when a contractor defaults, completing works at their expense and risk.
18.4
Expected Deliverable: Drafting a formal notice to a defaulting contractor threatening substitution works.
18.5
Module 87.1: Good functioning warranty (2 years): Separable equipment (shutters, plumbing fixtures, radiators).
18.6
Module 87.2: Decennial Warranty (10 years): Impairment of structural integrity (cracks) or unsuitability for its intended purpose (water leaks).
18.7
Module 87.3: Recourse action: Joint and several liability, calling in warranties from contractors and subcontractors.
18.8
Expected Deliverable: Legal memo assessing whether a specific defect qualifies for a 2-year or 10-year warranty claim.
18.9
Module 88.1: Filing a claim: Building the case file, strict statutory deadlines for the insurer (e.g., 60 days).
18.10
Module 88.2: The Insurance Appraisal: Insurer’s expert visit, estimating damages, proposing an indemnity settlement.
18.11
Module 88.3: Insurance litigation: Appealing the expert’s proposal, compensation caps.
18.12
Expected Deliverable: Formal declaration of a major claim (roof terrace waterproofing failure) to the Structural Insurer.
18.13
Module 89.1: Acoustic non-compliance: Impact noise, airborne noise, regulatory standards, in-situ testing.
18.14
Module 89.2: Delivery delays: Force majeure, justified weather days, delay damages owed to buyers.
18.15
Module 89.3: Lawsuits: Emergency expert appointment, provision for litigation costs, role of the specialized real estate lawyer.
18.16
Expected Deliverable: Settlement agreement template to compensate a buyer for a 4-month delivery delay.
18.17
Module 90.1: The Provisional Property Manager (Syndic): Designated in the reservation contract, mission for year 1.
18.18
Module 90.2: The First General Assembly: Ratifying the manager, provisional budget, maintenance contracts (elevators, ventilation).
18.19
Module 90.3: Handover of Common Areas: Presence of the HOA manager, specific snags, transferring utility contracts.
18.20
Expected Deliverable: Preparation checklist for holding the first General Assembly of the Homeowners Association.
18.21
QCM- 18
0 Questions
19: ASSET MANAGEMENT, OPERATIONS AND PROPTECH
Objective: Master post-delivery operations, managed real estate, and the integration of new technologies.
21
19.1
Module 91.1: Institutional Due Diligence: Technical, legal, and financial audits by the investor before closing.
19.2
Module 91.2: Leasing and Property Management: Commercial or residential leases, rent indexation, rent collection.
19.3
Module 91.3: Rent Guarantees: Rental guarantee agreements, vacancy risks, implications for the developer.
19.4
Expected Deliverable: Profitability modeling for a block sale (Calculating Yield / Cap Rate).
19.5
Module 92.1: Hard FM: Multi-technical contracts, preventive/corrective maintenance (CMMS).
19.6
Module 92.2: Soft FM (Occupant services): Concierge, cleaning, security, managing shared amenities.
19.7
Module 92.3: BIM for FM: Using the As-Built Model (BIM Level 6), digital logbook of the building.
19.8
Expected Deliverable: Drafting a Service Level Agreement (SLA) for a comprehensive Facility Management contract.
19.9
Module 93.1: Co-living: Economic model, service provision contracts vs. standard leases, common areas.
19.10
Module 93.2: Coworking and Flex Office: Short-term leases, on-demand management, hybrid spaces.
19.11
Module 93.3: Last-mile urban logistics: Logistics hotels, pedestrian drives, urban constraints.
19.12
Expected Deliverable: Feasibility comparison: Co-living space vs. traditional student housing.
19.13
Module 94.1: The connected building: Internet of Things (IoT), occupancy sensors, Building Operating Systems (BOS).
19.14
Module 94.2: Energy efficiency and AI: Predictive HVAC control, peak load shaving.
19.15
Module 94.3: User Experience (UX): Building smartphone apps (room booking, consumption tracking, access control).
19.16
Expected Deliverable: Designing the functional digital architecture of a Smart Residential Building.
19.17
Module 95.1: Reversible buildings: Designing a parking garage convertible to offices, or offices convertible to housing.
19.18
Module 95.2: Permit to innovate: Seeking derogations from zoning or building codes for exceptional, innovative projects.
19.19
Module 95.3: Design for Disassembly: Material passports (BAMB), circularity in design.
19.20
Expected Deliverable: Concept note on structural choices enabling office-to-residential reversibility.
19.21
QCM- 19
0 Questions
20: AUDIT, STRATEGY, AND PROJECT CLOSE-OUT
Objective: Close the operation, audit performance, draw lessons learned, and define corporate strategy.
17
20.1
Module 96.1: Finalizing SPV accounts: Discharge to the management, general assembly for dissolution.
20.2
Module 96.2: Liquidation: Appointing a liquidator, distributing the liquidation bonus to shareholders, capital gains tax.
20.3
Module 96.3: Releasing financial guarantees: Lifting the Completion Guarantee, closing bank credit lines.
20.4
Expected Deliverable: Minutes of the General Assembly for the early dissolution of an SPV.
20.5
Module 97.1: Financial audit: Budget variance analysis (Initial vs. Actual Final), analysis of the real net margin.
20.6
Module 97.2: Technical and Construction audit: Synthesis of schedule overruns, contractor defaults, evaluating the design team.
20.7
Module 97.3: Commercial audit: Sales velocity, analysis of price grid evolution, actual buyer profiles.
20.8
Expected Deliverable: Post-Mortem Matrix (Financial, Technical, Commercial) to be presented to executive management.
20.9
Module 98.1: Measuring satisfaction: Post-delivery surveys (Net Promoter Score – NPS), online reviews (e-reputation).
20.10
Module 98.2: ISO 9001 processes in development: Standardized procedures, operating manuals, internal audits.
20.11
Module 98.3: Continuous improvement: Integrating client feedback into the programming of future projects.
20.12
Expected Deliverable: Post-DLP customer satisfaction survey (1 year post-handover) and corrective action plan.
20.13
Module 99.1: Growth strategy: Organic vs. M&A (acquiring competitors), geographical expansion.
20.14
Module 99.2: Diversification: Creating in-house Project Management subsidiaries, holding companies for ground-floor retail, Property Management arms.
20.15
Module 99.3: New challenges: Ecological transition, Net Zero Land Take (Zero Artificialization), and focusing on brownfield regeneration.
20.16
Expected Deliverable: Strategic memo on adapting the Developer’s business model to strict “Net Zero Land Take” policies.
20.17
QCM- 20
0 Questions
EXPERTISE & EXCELLENCE IN REAL ESTATE DEVELOPMENT
Search
This content is protected, please
login
and enroll in the course to view this content!
Home
Cours
Cart
Account
Login with your site account
Lost your password?
Remember Me
Not a member yet?
Register now
Register a new account
Are you a member?
Login now
Modal title
Main Content